EDUCATION
Biladi School
An Operational Environment With Several Connected Systems Biladi School . Systems...
View Case Study: Biladi School
Projects
Project Overview
Design and implementation of an integrated sound system for the events hall in Umm Al-Qura Mosque, a project affiliated with the Ministry of Endowments with an area of 3,000 square meters and a capacity of 2,700 people.
Gallery
More Projects
EDUCATION
An Operational Environment With Several Connected Systems Biladi School . Systems...
View Case Study: Biladi SchoolTalk to ETQAN or send your BOQ for review. We will look at the environment, the systems involved and the operational requirement before proposing an architecture.