Projects

Selected Projects Across Iraq

From public infrastructure and education to entertainment, hospitality and commercial environments, ETQAN delivers integrated technology systems designed around the operational needs of each project.

Case Studies

Selected Projects Across Iraq

From public infrastructure and education to entertainment, hospitality and commercial environments, ETQAN delivers integrated technology systems designed around the operational needs of each project.

  • Dancing Water Fountain

    Dancing Water Fountain

    Tigris Tourist Village in Baghdad

    An Operational Environment With Several Connected Systems Design and implementation of the sound project for the dancing water fountain in the Tigris Tourist Village in Baghdad, in addition to

    View Case Study: Dancing Water Fountain
  • Anbar International Hotel

    Anbar International Hotel

    An Operational Environment With Several Connected Systems Design, equipping and implementing the sound and paging system in addition to the video surveillance system for the entire hotel.

    View Case Study: Anbar International Hotel
  • Umm Al-Qura Mosque

    Umm Al-Qura Mosque

    Iraq

    An Operational Environment With Several Connected Systems Design and implementation of an integrated sound system for the events hall in Umm Al-Qura Mosque, a project affiliated with the Ministry

    View Case Study: Umm Al-Qura Mosque
  • St. Joseph Church (Erbil)

    St. Joseph Church (Erbil)

    Iraq

    An Operational Environment With Several Connected Systems Design and implementation of an integrated sound system to cover the main hall and the halls and affiliated facilities

    View Case Study: St. Joseph Church (Erbil)

Planning a Similar Project?

Talk to ETQAN or send your BOQ for review. We will look at the environment, the systems involved and the operational requirement before proposing an architecture.